Thursday, 29 March 2012

Reflection of the shoot & Description of the shooting schedule plan

The shoot was to be held in the same location, though unfortunately the initial plan to obtain the footage in 1 sitting failed. However I was forced to work around this. The weather played havoc with my schedule. I planned for it to be done in one full day, of which the weather had to be nice. I had multiple dates available to record, though most of the time these dates failed to meet my necessity and urgency of recording. Once I had obtained half the footage in 2 weekends, I had to ensure there would be little, most preferably no continuity errors, the weather then had to remain the same or very similar each time recording took place. Once I was achieving to get the footage, it ran smoothly, though admittedly the quality is not to the standards I required due to both me and my helping camera woman busy in other areas of work. The video also had to be cut down, the original song and footage would last around 5 minutes, though I had to cut the product to 3 minutes. This turn of evens meant that I had to find a suitable place within the timeline of the song and footage to create a decent cadence. As abrupt as the finished version may be, I made sure the song finished on the root note, allowing more of a feeling that it had ended.

No comments:

Post a Comment